×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Sunday
18
Jan 2026
weather symbol
Athens 6°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

TAP pipeline has entered its final stage of completion

The TAP pipeline will have a total length of 878 km

Newsroom December 28 03:31

82.4% of the project for the construction of the TAP pipeline – which is expected to supply natural gas from Azerbaijan to Greece, Albania and Italy – has been completed, while 10% of the respective offshore part of the pipeline under the Adriatic Sea has been completed.

Every day, as the high-level executives of the consortium managing the project point out, hundreds of meters with the Right of Way are being cleaned and shaped, while the pipes are being connected, welded, placed in the trench and covered with soil according to the construction stages and the timetable of the project.

The TAP pipeline will have a total length of 878 km.

At its highest point, in Potom, Albania, the pipeline will reach 2,100 meters above sea level, cross nine mountain peaks over 500 meters above sea level and will “climb” over a 40% a steep slope, while the deepest part of the submarine section will be 820 meters in the Adriatic Sea.

>Related articles

President of Air Traffic Controllers: Another communications blackout possible in the near future

X is down, thousands report problems

Less alcohol and lower speeds with the new Highway Code and strict fines

The overall construction phase of the project is expected to be completed in the second half of 2019, as Italian Prime Minister Giuseppe Conte has given the green light for the completion of the TAP pipeline, expressing his support for the project after many months of negotiations and constant concern over the objections of the Italian side.

The aim, according to the consortium’s managing director, composed of BP (20%), SOCAR (20%), Snam (20%), Fluxys (19%), Enagás (16% 5%), is for 100% of the part of the pipeline passing through the Greek territory to have been completed within 2019.

Source: Nefeli Tzanetakou/balkaneu

Ask me anything

Explore related questions

#albania#economy#energy#greece#Natural Gas#oil#pipeline#Trans Adriatic Pipeline’s (TAP)
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Mitsotakis: Greece will not be challenged by anyone with the Belharra frigates – Our goal is to support farmers with transparent subsidies

January 18, 2026

Akylas receives rave reviews for his Eurovision 2026 Greek final entry: “We might actually win with this little gem,” Fans write

January 18, 2026

What Trump is seeking with the extra tariffs on eight European countries for Greenland, the trade deal with the EU is in the air

January 18, 2026

The global era of Messinia: How the film Odyssey and the lists of major media praise it for 2026

January 18, 2026

Greek exports broke records with a record 37 billion euros

January 18, 2026

Sakkari delivers the ‘point of the year’ as she advances at the Australian Open

January 18, 2026

New legal migration rules for 90,000 pending residence permits

January 18, 2026

Weather: Why the new cold wave brings little snow until Tuesday – Stronger weather deterioration expected from Wednesday

January 18, 2026
All News

> Lifestyle

A treat for readers: Dior, bags, and literature

The fashion house Dior starts 2026 with a dreamy new campaign

January 16, 2026

Sophie Turner’s first photo as Lara Croft released for Tomb Raider series

January 15, 2026

Vicky Chatzivasileiou: “I never gave up anything for television — It’s not my whole life”

January 15, 2026

Nikki Glaser reveals jokes cut from her Golden Globes hosting set

January 15, 2026

Next-level skylines: The towers transforming cities in 2026

January 13, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα